Confirm site power
Record voltage, transformer margin, installation conditions and any planned solar or battery connection.
AC and DC chargers from 3.5 to 1,080 kW, plus mobile and battery-integrated charging configured for the site, vehicle and destination market.
Charger power is useful only when the vehicle, connector, available electrical input and daily charging plan can use it.
Record voltage, transformer margin, installation conditions and any planned solar or battery connection.
List connector standard, arrival pattern, daily mileage, parking time and simultaneous charging.
Confirm public or private access, QR or POS payment, OCPP, API, branding and service scope.
Then compare power, connectors, payment and platform requirements.
For public sites balancing vehicle turnover, grid capacity, payment and OCPP.
View solution →For depot schedules combining overnight AC coverage with DC turnaround charging.
View solution →For hotels, offices and parking sites where charging speed follows dwell time.
View solution →For short-stop sites requiring high-power DC, redundancy and expansion planning.
View solution →Explore five product families selected from our 9 AC chargers, 8 DC chargers and 1 split charging system.





Reference preview; supplier trademark removed. Certificate holder, exact model, original document and validity are checked before quotation.
Each record is reviewed against the exact model, connector, destination market and current project requirement.
Reference scope includes selected 40, 80, 120 and 160 kW CCS2 configurations. The certificate holder, model code, number and validity must match the delivered unit.
Reference scope includes selected 11 and 22 kW Type 2 configurations. Installation form, enclosure and delivered branding are checked with the applicable documents.
Reference project records include a 160 kW dual-connector CCS2 configuration and OCPP coordination. Applicability is reconfirmed for the current project.
Reference project records include selected 80, 120 and 180 kW CCS2 configurations. Current procurement and grid requirements are checked before supply.

The source catalog includes enterprise honors, management-system certifications, operating qualifications and intellectual-property records. Holder, validity and applicable scope are checked before they are used in a project document set.
Review honors and qualifications →
Bring stored energy to vehicles, service teams and critical roadside equipment.
View solution →Selected customer-side records from project coordination and equipment delivery. Names and locations are withheld for privacy.View all customer cases →
Face-to-face coordination around operating needs, equipment options and delivery requirements.
A delivery-side record after equipment arrival and on-site coordination.
In-person communication supports project follow-up and local operating feedback.
A customer-side record during post-delivery communication at the operating location.
Selected workshop and export records show cabinet preparation, production staging and protective packing before shipment.Production workshop →Export delivery →









Production scope, inspection steps, packaging method, labels, pallet or crate construction and container plan are confirmed for each order.
Project review covers local input, output interface, target equipment, climate, communications and shipping requirements.
Discuss your country requirements →