Document previews

Review the certificate image together with its model scope.

Previews help identify the relevant record; applicability is confirmed only after the original document is matched to the proposed model and delivered configuration.

01 · SGS CE reference · DC charging

Selected DC charger configurations.

Reference document for selected 40, 80, 120 and 160 kW DC charger configurations. Certificate holder, model code, connector standard, number and validity must match the proposed unit.

Preview shown for scope review; request the original document set before order.
02 · SGS CE reference · AC charging

Selected Type 2 AC charger configurations.

Reference document for selected 11 and 22 kW AC charger configurations with Type 2. Installation form, enclosure, delivered branding and model scope are checked against the original document.

Supplier trademark removed from this website preview; the original document remains the verification source.
Available reference scope

Overseas qualification records for selected AC and DC chargers.

These records support project review; they are not a blanket certification claim for every product shown on the website.

01

SGS CE · DC charging

Reference records cover selected 40, 80, 120 and 160 kW DC charger configurations with CCS2. The exact certificate holder, model code, report or certificate number and validity are checked for the delivered configuration.

02

SGS CE · AC charging

Reference records cover selected 11 and 22 kW AC charging configurations with Type 2. Installation, enclosure, branding and model scope must match the final documents.

03

Thailand · PEA project qualification

Reference project records include a 160 kW dual-connector CCS2 configuration and OCPP coordination. Applicability is confirmed against the project tender and current local requirements.

04

Indonesia · PLN project qualification

Reference project records include 80, 120 and 180 kW CCS2 configurations used in local testing and cooperation. Current procurement and grid requirements are rechecked for each project.