Define the temporary load list

Construction & Temporary Power
Supply temporary power for site offices, work lights, tools and approved construction equipment as the project moves.
Discuss this applicationMatch temporary power equipment to each construction phase.
Construction demand changes by phase and location. A mobile storage system can be relocated between work zones and recharged from the supply available on site.
- Work lights
- Site offices
- Electric tools
- Temporary equipment supply
Construction power deployment examples


Define loads, select capacity and connect approved distribution.
Select power and energy capacity
Position the system near the work zone
Discharge through approved distribution equipment
Construction-load data required for quotation
- AC or DC load type
- Starting and peak power
- Operating hours
- Distribution and protection equipment
Size the application before selecting equipment.
Use these questions to prepare a technically useful quotation request.
What information is needed to plan construction power?
Start with ac or dc load type, starting and peak power, operating hours, distribution and protection equipment. These inputs determine the required power, usable energy, recharge window, interface and operating method before a model is proposed.
Which MAINERAY-selected equipment can support this application?
V2L30KW, G2V Series, Z200120 are the initial equipment families to review. The final choice depends on the vehicle or load, available input, required runtime, transport route and destination-market requirements.
How are power, energy and recharge time sized?
Power in kW must cover the highest simultaneous load, while usable energy in kWh must cover the operating period. Recharge input and the available recharge window are then checked so the system can repeat the required duty cycle.