Construction & Temporary Power
Solutions

Construction & Temporary Power

Supply temporary power for site offices, work lights, tools and approved construction equipment as the project moves.

Discuss this application
Temporary distribution

Match temporary power equipment to each construction phase.

Construction demand changes by phase and location. A mobile storage system can be relocated between work zones and recharged from the supply available on site.

V2L30KWG2V SeriesZ200120
Typical applications
  • Work lights
  • Site offices
  • Electric tools
  • Temporary equipment supply
Site setup

Define loads, select capacity and connect approved distribution.

01

Define the temporary load list

02

Select power and energy capacity

03

Position the system near the work zone

04

Discharge through approved distribution equipment

Project inputs

Construction-load data required for quotation

Project FAQ

Size the application before selecting equipment.

Use these questions to prepare a technically useful quotation request.

What information is needed to plan construction power?

Start with ac or dc load type, starting and peak power, operating hours, distribution and protection equipment. These inputs determine the required power, usable energy, recharge window, interface and operating method before a model is proposed.

Which MAINERAY-selected equipment can support this application?

V2L30KW, G2V Series, Z200120 are the initial equipment families to review. The final choice depends on the vehicle or load, available input, required runtime, transport route and destination-market requirements.

How are power, energy and recharge time sized?

Power in kW must cover the highest simultaneous load, while usable energy in kWh must cover the operating period. Recharge input and the available recharge window are then checked so the system can repeat the required duty cycle.