MAINERAY · Resources

EV charging project selection guides.

Prepare the site, vehicle and operating data needed to compare AC chargers, DC fast chargers and split charging systems.

01 · Products

Choose charging power from parking time, vehicle demand and site input.

Start with the operating site. A higher power rating is useful only when the vehicle, cable, grid connection and daily charging plan can use it.

Product familyPower rangeTypical useSelection cue
INTEK-AC Series3.5–22 kWHomes, workplaces, hotels and long-stay parkingUse AC when vehicles remain parked for several hours.
INTEK-DC 20–80KW Series20–80 kWDealerships, service sites and smaller commercial parkingUse compact DC where faster turnover is needed without a large footprint.
INTEK-DC 80–180KW Series80–180 kWPublic sites, fleets, logistics parks and commercial hubsUse the main DC range for two-connector commercial charging and regular daily turnover.
INTEK-DC 240–480KW Series240–480 kWBus and truck depots, transport hubs and high-use corridorsUse high-power DC when vehicle demand and the site connection support rapid turnaround.
INTEK-DC 240–1080KW Split System240–1080 kWLarge multi-bay hubs and heavy commercial depotsUse a split system when one power cabinet must allocate output across several dispensers.
02 · Project checks

Define the project before choosing the cabinet.

Use these guides to prepare the electrical, vehicle and operating information needed for a useful proposal.

01

Site power

Confirm voltage, available capacity, transformer margin and any planned PV or battery connection.

02

Vehicles and dwell time

List vehicle voltage, connector, daily mileage, arrival pattern and the time available for charging.

03

Operation

Confirm public or private access, payment, OCPP platform, API, branding and service responsibilities.

03 · Operations & integration

Payment, platform and project configuration

Select the operating method together with the hardware, not after installation.

01

OCPP version

02

CSMS responsibility

03

Payment provider

04

API and data fields

05

QR · POS · RFID

06

OCPP · API · 4G · RJ45

04 · MAINERAY

Documentation follows the delivered configuration.

Technical values follow the supplied product catalog. Ambiguous fields are marked for confirmation rather than guessed.

01

Technical data

Technical values follow the supplied product catalog. Ambiguous fields are marked for confirmation rather than guessed.

02

Final branding, certification scope, platform integration and warranty are confirmed for each order.

Final branding, certification scope, platform integration and warranty are confirmed for each order.

03

Remote after-sales support; project-specific on-site service when required

1–2 year warranty by model, configuration and contract. Remote after-sales support; project-specific on-site service when required.

Request configuration & quotation