Enclosure staging
Charging-equipment enclosures prepared for the next assembly stage.
Workshop records showing enclosure staging, internal assembly, cable preparation and final equipment checks. Branding and configuration vary by project and are confirmed before production.
Select any photo to view a larger version. These records are presented as project and supply-process evidence.
Charging-equipment enclosures prepared for the next assembly stage.
Internal cabinet access during production preparation.
A batch prepared with project-specific customer branding.
Cabinet assembly and component preparation at the workstation.
Power-module and internal cabinet assembly records.
Charging units arranged for completion and inspection.
Multiple charging cabinets staged as a production batch.
Exterior and cabinet checks on completed equipment.
Units staged by configuration before final checks.
Exterior finish and enclosure detail recorded during preparation.
Charging cable and cabinet interface inspection.
Cable and connector preparation before equipment completion.
Operator interface and cabinet finish checked before delivery.
Cabinet access and service-area inspection.
Final review of equipment, labels and accompanying records.
Charging cables arranged and checked for the required configuration.
Compact charging units arranged for batch inspection.