Record vehicle duty cycles
Confirm battery capacity, voltage, arrival state, turnaround window and daily route energy for each vehicle group.
Configure high-power and split DC charging for electric buses, trucks and logistics fleets around vehicle duty cycles, bay layout and power allocation.
Heavy commercial vehicles require a site-level plan. Vehicle voltage, route turnaround, connector position, cable reach, simultaneous charging and daily energy demand determine the equipment architecture.
Confirm battery capacity, voltage, arrival state, turnaround window and daily route energy for each vehicle group.
Check vehicle length, connector position, cable routing, dispenser protection and safe service access.
Compare high-power integrated cabinets with central power and multiple dispensers based on simultaneous demand.
Delivered branding, documentation, integration and warranty scope are matched to the final order.
Provide vehicle voltage, usable battery capacity, connector standard, arrival state of charge, departure deadline, daily mileage and the number of vehicles charging together.
The split charging range can be configured with multiple dispensers. Final connector count, power allocation and cable arrangement must be matched to the project.
Reserve transformer, switchgear, cable and physical bay capacity where possible, and confirm whether the selected architecture supports additional modules or dispensers.